Kurnell Reservoir – Relining and Roof Replacement

Sydney Water
Location: 
Kurnell NSW
Australia
Consultant: 
SASTTI JV
Date: 
Dec 2018 to Nov 2019

Kurnell Reservoir – Relining and Roof Replacement

Description: 

The objective of the project was to remove the existing bitumen lining and replace with a contemporary epoxy coating (in accordance with current Sydney Water specifications), which has a superior life, is safer to handle and may be patch repaired in the future. The project involved replacement of the existing roof structure with an all-aluminium roof to provide additional corrosion resistance properties along with reduced maintenance and lifecycle costs.

In addition, opportunistic improvements to the reservoir including ventilation, inflow management and access were to be undertaken whilst the reservoir was offline and empty.

 

Key Aspects: 
The project objectives were met through the delivery of the reservoir roof replacement and reline, delivering an epoxy coating solution to meet current Sydney Water specifications, and a superior all-aluminium roof structure to provide maintenance and lifecycle benefits
The scope of works included, but was not limited to:
Existing roof structure demolition
Existing bitumen lining removal
New roof structure installation
New coating system application
The activities and risks for these works included, but were not limited to:
Working in a confined space
Working at heights
Mobile plant and equipment
Inclement weather including frequent high winds
Presence of hazardous substances (lead, PAH)
Working in bush fire prone area with limited access
High pressure abrasive blasting
Ultra high water jetting
Working on isolated assets