BLB1 – Hybrid CP
BLB1 – Hybrid CP
The Bulk Liquid Berth 1 (BLB1) rehabilitation project is a 2-year project being undertaken for Port Botany Operations. BLB1’s purpose is to manage the import/export of bulk liquids including hazardous (LPG & petroleum) and non-hazardous (lube oils) substances. BLB1 has been operating for over 40 years, during which time the wharf has endured extreme weather conditions, ocean swell/currents and consistent shipping operations. Due to the wharf’s age and the harsh environment it resides in, it has experienced significant reinforcement corrosion causing concrete spalling.
Freyssinet Australia has been engaged to repair the damaged concrete and to install a hybrid Cathodic Protection (CP) system, which functions by utilising sacrificial anodes and an impressed current design. When installed together, they effectively generate a large battery thus protecting the wharf against corrosion. This system can be turned on and off with ease, it is ‘intrinsically safe’ compliant, and has been designed to protect the wharf for the next 40-50 years.