Woronora Pipeline Repair Works
Woronora Pipeline Repair Works
Woronora Pipeline was a 30km project that stretched from Woronora Dam to Oatley at its most northern point. The pipeline provided the only route for water to leave the dam to provide water to south Sydney and was the only means of water for the town of Helensburgh.
The project was a repair and upgrade job with multiple aspects to it, so all of types of workers and suppliers had to be utilised. The major work for the project was the replacement of 98 of the saddles (pipe supports). 15 joints were also recoated and then clamped to prevent leaks. 4 separate locations totalling a length of approximately 40m were blasted and painted. The last major task was to encase 8 separate locations in concrete to help stabilise the pipe and protect it from water ponding issues and to extend existing encasements.