Key Aspects:
The ICCP system designed, installed and commissioned by Freyssinet included 312 anodes and references, 425m of underwater continuity bar, over 1.5km of cable tray, 35km of cable and pile wrapping of 225 tubular steel piles.
The design was tailored to meet the specific requirements of both the client and the tenants of each site.
Work was carried out in close proximity to live shipping so the safety procedures for working around ships were carefully planned and closely monitored throughout.
Access to the work locations presented a number of challenges in terms of providing a safe and efficient access system for the workers. Access arrangements were designed to suit site conditions and included pontoons with handrails and guardrails, boats with scaffold arrangements and also a gangway and scaffold towers to access the water.